Roof waterproofing and building repair work
Roof waterproofing and building repair work
The second and third floors of the house leaked due to cracks in the roof. The construction team used the VALUE construction method to combine the cement with VMP-1000. Because of its strong bonding strength and strong tensile and compressive force, it can prevent the building from cracks caused by cold shrinkage, thermal expansion and vibration. The crack repair is completed, and the water leakage problem is completely solved.
The outer wall is coated with GAINA layer to provide heat insulation for this rooftop cabin.
The construction was completed within 3 days to solve the problems of cracks, water leakage and appearance.